The world’s largest natural gas processing platform will be put into production
Tortue FPSO is the first FPSO project of BP in China, and is also the largest natural gas processing platform in the world today. The ship is 270 meters long, 54 meters wide and 31.5 meters deep. The design service life is 30 years, the maximum drainage capacity is about 320000 tons, and the oil storage capacity is not less than 1.44 million barrels.
Tortue FPSO has moved to the coast of Mauritania and Senegal in West Africa, and will soon serve the development of GTA Phase I project, a world-class LNG hub. The FPSO is a key part of GTA’s large-scale integrated development project, which also includes underwater development of gas fields and offshore floating liquefied natural gas (FLNG) facilities. The first phase of the project will produce about 2.3 million tons of LNG/year.
As an enterprise certified by the world’s five largest classification societies, Haihao Group closely follows the progress of the world’s FPSO project. At present, the flanges, steel pipes, elbows, tees, prefabricated products and other pipeline engineering supporting products produced by Haihao have been widely used in the pipeline systems of submarine pipelines, FPSO, LNG and other ships. If you are interested in related products or services, please feel free to consult us.