• Corporate vision to become the pipeline industry Toyota
  • Corporate mission to enhance the quality level of Chinese manufacturing
  • Business goals domestic industry first
Another FPSO from MODEC will ship oil for the first time this year

Another FPSO from MODEC will ship oil for the first time this year

On September 1, last year, the big ship group of China Shipping Group delivered the ANITA GARIBALDI MV33 floating production, storage and unloading tanker refitted for Singapore MODEC. This is the 16th FPSO provided by MODEC in Brazil, and the sixth ship since MODEC began operating in the Campos Basin in 2003. The fixed term of the modified ship lease contract is 25 years, and the shipowner is expected to ship oil for the first time this year.

Polyurethane insulation pipes

Polyurethane insulation pipes

The ANITA GARIBALDI MV33 project is a super-engineering with a design life of 34 years and a total weight of more than 100000 tons, which is refitted from a VLCC and designed in detail by the Design Institute of the Large Ship Group. Its designed operating water depth is 670 meters, its oil storage capacity is 1 million barrels, its daily processing capacity is 80000 barrels of crude oil, its daily processing capacity is 248 million cubic feet of natural gas, and its daily production water injection capacity is 390000 barrels. It will serve in the Brazilian offshore oil fields in the future.

Forged flanges

Forged flanges

Haihao Group has participated in the partial supply of the FPSO, and its products include ABS certified flanges, elbows, tees, ship plates and other pipeline supporting products. Haihao Group currently has ABS, BV, RINA, RS, DNV five major classification societies certification. If you need the pipeline supporting products certified by the classification society or need the third-party inspection of the classification society, please feel free to consult us.

PREV
NEXT

Related